Groundwater Feasibility studies

Kala has undertaken over 500 groundwater feasibility studies throughout the province. Well depths to 305 m (1000 ft) and yields up to 158 L/s (2,500 US gpm).

Typical tasking includes:

  • Task 1 – Groundwater Potential Evaluations (GPE)
  • Task 2 – Test well drilling and pumping tests
  • Task 3 – Production well drilling
  • Task 4 – Pumping test, analytical chemistry and Ground Water Under Direct Influence of Surface Water (GWUDI) considerations
  • Task 5 – Analysis and reporting
  • Task 6 – Source Protection Program